Abstract
This project is a simulation assembly line for watches in EPSON
Precision factory(Johor)Sdn.Bhd. at No. 31 Jalan Kempas Baru, 81200
Johor Bahru, Johor. This project focuses only on the assembly line. This
assembly line is the assembly line for SEIKO watches model 5M. In the
assembly line section there are a number of problems which can cause a static
state in the production and this is a problem because demand are rising. The
assembly line will be represented into simulated model. Experimentation for
the model are done to optimized the assembly line. Tho development of this
simulation model is based on the real environment and applylng it into a
computerized form using the Pro-Model4.2 software. Thus the result of the
simulation will give the management an alternative to enhanced the
productivity and solving their problem at the same time.
Website : http://ir.fsksm.utm.my/1694/
No comments:
Post a Comment