Friday 26 April 2013

Sistem Penjadualan Projek Bagi Pembinaan


Abstract

          Scheduling is one of the most important part or can be said as a main part in a project. The rapid growth of technologies nowdays lad the everybody to develop system that can provide retrieval of information process easier, systematic and secure. Scheduling system that will be develop have many activity or jobs depands on the real constaints whereby all the activities are relatives to logical step. It means that one activity must be done before starting the next activities. Therefore, the use of scheduling is to help management to minimize complete time for the last task or activity. SDLC with waterfall paradigm has been chosen as the methodology and the purpose of the system is can generate optimum scheduling and systematic manpower scheduling using Network Analysis . Scheduling reports can be generate effective and accurately by using this scheduling system. The system was developed using Microsoft Project 2000 and Visual Basic 6.0. Hopefully, this system can help the organization to make job more easier. 

No comments:

Post a Comment