Friday 26 April 2013

Sistem Penjadualan Staf Penyelenggaraan Mesin Di GG Circuits Industries Sdn. Bhd.


Abstract

          This project is concern with the scheduling system for the maintenance staffs in Maintenance Department, GG Circuits Industries Sdn.B hd. The existing manual scheduling system is not effective and systematic. Furthermore, only the staff schedule for quarterly and yearly preventive maintenance is built whereas the staff schedule for weekly preventive maintenance is also required. Therefore, a computerized scheduling system, which consists of weekly, quarterly and yearly preventive maintenance, is developed to assist on doing the staff schedule for every week. Waterfall model is chose as the methodology for the development of this computerized scheduling system. In addition, Heuristic Approach with combination of Break-Combine Shategy and Solution-Building Strategy is implemented as scheduling technique for this system. Microsoft Visual Basic 6.0 is used to develop the user interface and Microsoft Access 2000 is used to develop the database of the system.

No comments:

Post a Comment